Decarbonization
Engineering the path to net-zero — on schedule and on budget.
A phased, capital-disciplined approach that transforms compliance pressure into asset value over the LL97 2024–2050 horizon.
Methodology
Five connected phases. One accountable team.
Phase 01
Diagnose
ASHRAE Level II/III audit, envelope thermography, BMS analytics, and a verified carbon baseline.
Phase 02
Roadmap
Phased ECM portfolio aligned to 2024 → 2030 → 2050 LL97 limits and capital availability.
Phase 03
Engineer
Heat-pump design, electrification, controls modernization, and envelope retrofit packages.
Phase 04
Capitalize
NYSERDA, utility, and IRA incentive capture stacked against the capital plan.
Phase 05
Operate
BES Platform live M&V, fault detection, and demand-response participation.
Outcomes
Measured. Verified. Reported.
−42%
Avg portfolio EUI reduction
3.4x
Avg incentive multiplier
100%
LL97 compliance through 2030
+11%
NOI uplift on retrofitted assets
Start Your Engagement
The penalty period is here.
Let's engineer the path through it.
Share your property details and BES will return a no-obligation LL97 exposure summary, recommended audit pathway, and incentive eligibility within five business days.
